Description
Airframe
Total Time Since New: 15472:43 Hours
Total Landings Since New: 9408 Cycles
Home base: LEJ/EDDP Leipzig, Germany, Europe
Landing Gear:
Overhaul/Restoration: MAY 2002 at 5982CYC (6000CYC interval)
Next due: 11982 CYC (2574 CYC remaining)
Engine(s)
Engines: TFE731-2C-2B
P/N 3070170-1
Engine on Honeywell agreement
S/N P89151C DOM 04/1981 / 14544:01 Hours, 8872 CYCLES
S/N P89153C DOM 05/1981 / 14241:08 Hours, 8584 CYCLES
APU: N/A
Avionics/Radios
CVR UASC CVR-30B
FDR L3 COMM SSFDR F1000
Dual ADF Collins ADF-60A
ELT Artex C 406-2
Dual DME Collins DME42/40
AP J.E.T. FC-200F
VHF-S/E Collins VHF21C, 8,33/25Khz
VHF-S/E Collins VHF21C, 8,33/25Khz
HF-S/E Sun Air RE800
Dual VHF-NAV Collins VIR-30A
RAD ALT Collins ALT-55B
TCAS Bendix/King TPU-67B Vers. 7.1
TAWS UASC TAWS Class A
XPDR Mode-S Bendix/King MST-67A
XPDR Mode-S Bendix/King MST-67A
WX Radar Sperry RT-4001
FMS UASC UNS-1K
MF Display UASC MFD-640
Additional Equipment
Learjet Group approval for RVSM
Allied Signal conversion to TFE731-2C
AirCon conversion from R12 to R134a
Year Painted
2016
Exterior
Paint new AUG 2016
Beige 12DQ Beige 6404
Black RAL 9005 jet black
Black stripes RAL 9005 jet black
Interior
Refurbished Aug 2016
(Seats, Carpet, Sidewall, Panels)
Number of Passengers eight (8)
Forward Cabin Configuration three (3) place
Aft Cabin Configuration five (5) place group with opposing two-three (2-3)
Galley Location Forward Cabin
Baggage, 40 cu.ft
Lavatory
Inspection Status
CAMP controlled, Status Report up to date
Phase A1-A6: performed AUG. 2016
Phase B1-B6: performed AUG. 2016
Phase C1-C6: performed AUG. 2016
Phase D1-D6: performed AUG. 2016
12 Year Inspection: performed AUG. 2016
12.000 Hrs Inspection: performed AUG. 2016
ENG 2100Hrs OVH/MPI:
performed at 13064:49HRS, OCT 2010 ENG#1
performed at 12780:14HRS, FEB 2010 ENG#2