Delivery Date:Within 3 days after your order is confirmed
Offer
If your operational fleet usage exceeds 1.5 hour flight legs, the operational gains of havin winglets installed on your fleet will not only save 4.5% fuel costs from day one, additional take off weight gets an added bonus of 6,000 lbs. per leg. Installation combined with a letter check or conversion is seamlessly incorporated. Normal installation down time should be estimated to be 8 to 10 days.
