Description
Airframe
As of 12/6/2017:
6,328.8 Hours Total Time
7,330 Landings
Enrolled on CESCOM Maintenance Tracking
Engine(s)
Pratt & Whitney PW530A (4,000 TBO)
Since Overhaul: 2,290 hours both engines
Since Hot Inspection: 356 hours both engines
Hot Inspection By: Pratt & Whitney
Engine Overhaul By: Pratt & Whitney
Modifications/Conversions
Garmin GMX-200 MFD
Avionics/Radios
ADF: King KR-87
Avionics Package: Honeywell Primus 1000 IFCS / Silver Crown
Communication Radios: Dual King KY-196A
CVR: CVR
DME: Dual Honeywell DM-441B
EFIS: Honeywell 3-Tube 8x7-inch
Flight Director; A/P: Honeywell Primus 1000 IFCS
FMS: Universal UNS-1K version 802 w/DTU-100 & GPS
HSI: AAR HSI-315A Standby
Navigation Radios: Dual King KN-53
Radar Altimeter: Yes
Stormscope: BFGoodrich Skywatch SKY-497
TAWS: Bendix/King KGP-860 EGPWS
TCAS: Honeywell CAS-66A TCAS-I
Transponder: Dual King KT-70 Mode S
Weather Radar: Honeywell Primus 660 Color
Additional Equipment
Cockpit:
Bendix/King KGP-860 EGPWS
Garmin GMX-200 MFD
Garmin GDL-69 XM Weather
Shadin Air Data Computer
Angle of Attack Indicator
Artex C406-2 ELT
King KMR-675 Marker Beacon
N1 computer
Altitude alerter & Preselector
Speaker Audio Inhibit Switch
Crew Accessories:
ChartView
Monorail Sunvisors
110-Volt Outlet
Cockpit Assist Handles
Dual Navigation Chart Cases
Cockpit Relief Tube
Equipment:
Freon Air Conditioning
Thrust Reversers
Lead Acid Battery
Anti-Skid Brakes
Extended Aft Baggage w/Ski Tube
Airframe Tracking Program:
CESCOM (Cessna Computerized)
Year Painted
2007
Exterior
Matterhorn White with Imperial Red, Black Velvet, and Platinum stripes. New 2007
Year Interior
2007
Interior
Seven passenger fire-blocked interior refurbished 2007. Beige leather seating, sheepskin-covered crew seats, aft belted lav seat. Forward left-side deluxe refreshment center with MAPCO. High-gloss wood veneer cabinetry, executive tables with inlays. Dual 110-volt outlets, aft enclosed lav, forward right-side divider with one-piece half-length curtain, aft flushing toilet.
Inspection Status
Phase 1-4 Inspections c/w 03/2017
Phase 5 Inspection c/w 12/2017