Airframe
Total Time on Aircraft: 1,834.5 Hours (As of November 14, 2017)
Landings: 736
Entry into Service: November 2009
Engine(s)
Rolls Royce TAY611-8C
Engine # 1 TSN 1,798.6 Hours
Engine # 2 TSN 1,798.6 Hours
APU:
HonEYWELL GTCP36-150
Total Time Since New 1,415 Hours.
Avionics/Radios
Honeywell Primus Epic PlaneView™
Four Honeywell DU-1310
Honeywell / Kollsman VGS
Honeywell GP-500
Three Honeywell MAU-923
Three Honeywell MC-850
Three Honeywell AZ-200
Honeywell WU-880 with Dual Controllers
Dual Honeywell RT-300
Three Honeywell LASEREF V
Three
L3 CVR
L3 TCAS 2000 )
Goodrich GH-3100
Honeywell MCS 7000 + SATCOM Iridium
Airborne Flight Information System with SATCOM link AFIS
IRIDIUM AIRCELL AXXESS II
Dual Mason CCD
Honeywell/Kollsman HUD/EVS Gen II
Additional Equipment
Securaplane External Camera System (forward, aft and tail views)
Securaplane 500 Security System
Aft Equip Bay Storage Box
Electric Window Shades
115V/60Hz Outlets Throughout Cabin
Exterior
Two Tone Overall White with Green Belly and Burgundy and Gray Combination Stripes Original Savannah / Good Condition
Interior
14 Passenger Forward Galley Universal Floor Plan Configuration.
Savannah Completion
Forward cabin features a four (4) place club with berthing seats with pull out tables
The mid cabin features a four place left side conference group opposite a credenza which incorporates the cabin entertainment system
Aft cabin offers a Private Four Place Couch Opposite Two Individual Seats
All seating is covered in beige leather
The forward galley features a Hi Temp oven and microwave as well as Coffee service, large ice drawers, cold food storage and large counter top work surface
Inspection Status
PROGRAMS AND MAINTENACE:
Airframes on Gulfstream Plane Parts and CMP
Engines enrolled on Rolls Royce CorporateCare
APU enrolled on Honeywell MSP GOLD
One operator since new
Enhanced Soundproofing
ASC 908A - PlaneView Master Operating System Software updat (Cert G)
All maintenance performed at Gulfstream Service center Savannah
Structural Warranty for Primary and Secondary Structure until 2024
Fresh 96 Month Inspection at Gulfstream Aerospace Savannah.